interview question what if failed to meet deadline

The Goal

The interviewer wants to know how you respond to situations in the workplace where y'all might feel like you lot failed. Draw to the interviewer how you react when you miss a target like a projection deadline or a sales target.

How to Reply

Perhaps you merely underestimated the depth of the project, or possibly you faced a distraction at work. Whatever the situation was, discuss the case, what you did, and the upshot. Show the interviewer that you practise non accept a defeatist mentality. Nobody is perfect! The interviewer knows that there volition be times when deadlines laissez passer and projects go sideways. They want to know how you react despite the initial failure.

Pro Tip

Behavioral-based interview questions that brainstorm with 'Tell me about a time...' are best answered using the STAR method. STAR is an acronym for Situation, Job, Activity, Result. Organizing your response using this framework will ensure that yous provide the interviewer with the right amount of information and item to course a compelling reply.

What to Avert

Avoid merely giving a general argument nigh your time management skills, such as, 'I always encounter deadlines. I tin't think of a time when this happened to me.' Responses like this tin brand the interviewer feel you are avoiding the question or making yourself wait like a perfect candidate without flaws.

Christine's Answer

"(Situation) Last month, I missed a project deadline for an important client. (Task) I missed this deadline because I underestimated the demand for back up staff on the project. Despite working overtime, I missed the deadline by three days. (Action) When I realized that the borderline was fast approaching, I chosen the customer and apologized. I took full accountability for the inconvenience and provided a new timeline that I could meet. (Result) I met the second deadline that I promised the customer, and they were impressed with my transparent and honest attitude throughout the process."

Rachelle's Admin Instance Answer

"(Situation) In my current role, we had a serious backlog of candidates who were waiting for a response on their applications. (Chore) Since I am the Admin Assistant, my boss tasked me to sort through our visitor'southward ATS arrangement and turn down candidates who did non possess the minimum didactics requirement for a position for which we were hiring. (Activeness) Because I do not take a lot of feel in recruitment or resume reading, the chore took me much longer than my boss expected. I realized later a few hours that my pace was not what he was expecting, so I offered to take some work home to catch upward. (Result) He declined the offer but was happy with my willingness to become over and above to meet the original deadline. In the finish, we agreed on a new deadline that I was able to run into."

Rachelle's Marketing Case Answer

"(Situation) Recently, I needed to write up a new client'south projected account volume for the following financial year. (Chore) I was the only person on our team available and equipped to perform this with a fast turnaround. (Activity) I jumped into the task right away; withal, despite working later on hours to complete the projection, I knew it was not going to be the quality piece of work I wanted to submit. In one case I recognized this, I was honest with my boss almost the revised timeline needed to complete the job. (Issue) My dominate was agreement and simply swapped my review by one twenty-four hour period to give me the appropriate time to set. They also gave me access to an operations assistant to assistance with preparation. While I was embarrassed to fall brusque of expectations, I learned to communicate early and ofttimes and ask for help when needed."

Rachelle'south Sales Example Answer

"(Situation) While working equally a Sales Manager for Visitor ABC, we fell behind on sales targets afterward a product launch became delayed due to further endurance testing. (Chore) As the Sales Manager, it was upwardly to me to assist my team of 12 reps pivot to the change and start delivering results despite this delay. (Action) I reacted past identifying our earliest possible completion date so informed our supervisors and customers. I besides crafted a new pre-sale initiative for the reps to push. (Result) Considering I remained pragmatic through the entire situation and presented solutions rather than giving up, my team exceeded the sales target by 23%."

Rachelle's Retail Example Reply

"(State of affairs) When working in the shoe department at Company ABC, we noticed a severe issue in inventory tracking subsequently the busy vacation season. (Chore) Equally the Inventory Manager, information technology was up to me to reorganize the inventory room, which was 4000 sq feet in full. It was a huge undertaking, and as I was so eager to please that I underestimated the amount of time it would take to redo the system. I gave a 3-week time estimate, and within a week, it was clear that the deadline was unrealistic. (Activity) I immediately went to upper management with a plan. I could see the timeline, provided I received boosted resources such every bit overtime hours and additional staff. Or, we could push the inventory projection to a 6-week timeline. (Result) By communicating early on, albeit my error in judgment, and request for help, the worst thing that happened was a bit of initial thwarting. More than anything, my management team appreciated the transparency. The situation taught me to dig deeper into the scope of a project before committing to a timeline."

Rachelle's Instructor Example Answer

"(State of affairs) Last year, our faculty needed to refresh the math curriculum for our grade 4/5 course. (Job) Every bit the Learning Leader, it was upward to me to accept the initiative on the project. The project was robust, and our timeline was tight. It quickly became credible that nosotros did not have plenty time to terminate. (Activity) Rather than rush the work and take a crummy event, I encouraged the squad to work on weekends, ensuring a more constructive, engaging curriculum. My opinion was that, past identifying our objective and refusing to settle for less, nosotros would keep the best interest of our department and students in mind. To me, this seemed like a better option than sacrificing our goal. Not anybody agreed with me; notwithstanding, I kept my finish of the bargain and worked double-time to complete my tasks. (Result) In the end, although I sacrificed my fourth dimension to meet the goal, nosotros did fail every bit a team. I learned that I could exist persuasive, but in the end, I cannot control the actions of others. However, I was proud of myself for delivering the high-quality work that I wait from myself."

Rachelle'southward Director Instance Answer

"(State of affairs) While working for Company ABC, our IT systems went through a company-wide overhaul. (Task) Every bit the IT Manager, I had to organize this system update across the system. Although I had a great corporeality of lead fourth dimension, some of the vendors failed to complete their tasks on time, and I knew that nosotros were unable to run into the deadline for the system launch. (Activeness) As shortly as I realized that the borderline was non doable, I utilized transparency and communicated in person to let the leadership team know we would experience a delay. I was specific about what went awry and assured them that the IT squad was doing everything nosotros could to reach the launch ASAP. (Result) In the end, I was able to resolve the issue with some of our vendors, negotiating rush services. We did non come across our borderline; however, we were but one week out, which wasn't as bad equally I initially anticipated."

41 Community Answers

Anonymous interview answers with our interview experts feedback

Bearding Answer

"Correct now, I am an IT management consultant and my current project is to be a test coordinator for implementation of SAP during different phases. So after a couple of months when I needed to handle a phase all by myself to exam a certain amount of test scenarios until a deadline. Simply even because I tried so hard and contacted different person for exam data, simply somehow I often got forwarded to another person which was handled those examination scenarios and could provide me exam data. In the cease, I, unfortunately, did not make to test all the scenarios to the deadline. My reaction was that I started to reverberate for myself why I did not meet the deadline, what could I do better, what did I learn from this and what is the all-time possible action to practice farther. What I actually did was to ready a document for myself where I write almost all the systems which were connected, all the dependencies we have with other projects, contact details for point of contact persons. The result was that I in a structured style could handle the next phase better because I knew better how to act and who to contact in unlike situations and manage if unlike defects happen."

Nazish's Response

The idea is at that place but I recommend working on being a bit more clear and concise in your responses. Y'all don't desire to lose the interviewer with also many details.

"In my current function, equally an Information technology Management Consultant, there was a time when I needed to handle all phases by myself and examination certain scenarios within a borderline. I did not see the deadline equally I was unable to discover the back up that I needed when it came to some aspects of the information testing. I was not happy near missing the deadline, and then I decided to create a certificate for myself that noted the ways the systems were connected, all the dependencies our company had for other projects, and the concluding contact person at each stage. After this do, I felt very organized and structured, knowing if this situation happened again; I would be prepared."

Was this response helpful? or

Bearding Answer

"Terminal time I missed a deadline because I underestimated the staff that I needed to schedule for that project. So what I did was called my district manager and asked if I could have some more hours to finish this projection. She said no problem and thanks for reaching out to ready the issue earlier it became a bigger consequence. So I reacted past solving the issue, and the project got done merely past two days belatedly instead of a calendar week late. Everyone was happy."

Lauren's Response

Yous picked a great example that showed resourcefulness and a proactive work mode. Great work!

"I one time missed a project borderline due to an underestimation of staff required to complete the piece of work. When in stressful situations, I spring into activeness and become proactive versus reactive. I reached out to the District Manager to request more hours to complete the project (which was readily granted). My team and I were able to complete the project two days past due versus an unabridged calendar week. Overall, everyone was pleased with the result, including myself."

Was this response helpful? or

Anonymous Answer

"I have never been unable to meet a deadline, but I have come close to information technology. One day every bit a floater pharmacist, I was on-call and given a morning shift to cover for a pharmacy manager who abruptly quit the nighttime before. When I reported to the pharmacy, it was a disaster, to say the to the lowest degree. There were well-nigh 70 labels printed from the night before for prescriptions to be filled, nearly fourscore prescriptions to be entered, and over 50 to exist reviewed. Usually, when we open the pharmacy, all these functions are completed. Also, there were about 30 transfers to be chosen, and at that place was a line out the door. Every bit a new pharmacist, I was instantly overwhelmed; however, I realize that as a pharmacist in accuse, my response to stress will touch the technicians, so it was imperative to remain at-home and positive. I made a plan, and I shared it with the morning technician. I explained that we were dealing with an unusual situation, nosotros will take to rearrange the usual priorities and tasks for the morn shift, and adjust the workflow until we clear upward the mess. For example, the morning shift chemist and technician performed tasks related to inventory and made some adherence-related calls to the patients. I decided to put some tasks on hold until we got defenseless up preparing the promised prescriptions for the patients since that was a priority. I also asked the technician almost which tasks he is commonly best at, and I delegated those tasks to him beginning while I took care of the rest. When the side by side technician arrived which was two hours afterward we started, we explained the situation and the plan, and we rearranged tasks appropriately. My goal was to hand over an orderly pharmacy to the adjacent shift. I remained motivated and positive by thinking about the end result and motivated the technicians by providing positive feedback and celebrating every job we completed. When we filled all the prescriptions, we then completed all the transfers and were able to start working on the tasks I had deprioritized."

Rachelle's Response

You do an excellent task explaining the situation and then walking the interviewer through the action you took to tackle the consequence. This would have been a stressful situation; however, it seems you handled information technology all with poise and care. Overall, it sounds as though the 24-hour interval was a success despite all of the roadblocks y'all faced.

Was this response helpful? or

Anonymous Answer

"I was working on a project with a authorities bid, and I underestimated the render time of the procurement to inform u.s. of when they can get the pharmaceuticals into our warehouse. Once I realized this mistake, I quickly told the customer and my supervisors that the return time would be longer than expected. The customer was able to become an extension on the bid, and we were able to secure the projection."

Rachelle's Response

This is an informative example and showcases the fact that you are fast to human action and detail-oriented.

Was this response helpful? or

Anonymous Respond

"I was creating a new app. I was learning the software as I congenital it. I was struggling and running out of time so I asked my boss for some help equally I didn't think I'd terminate it. He assigned another team fellow member to take over half of it, then we finished the app on fourth dimension."

Rachelle'due south Response

This is an first-class example with a great solution and positive outcome. Well done!

Was this response helpful? or

Anonymous Answer

"I was one time working on a project for a higher-upward in which he kept asking for more functionality on a project which was very tedious and fourth dimension-consuming. I missed the initial deadline by a few weeks. However, in doing and then, I put in extra fourth dimension on the project and was also in constant communication well-nigh my progress. That way, he didn't feel as though he was out of the loop."

Rachelle's Response

It'southward nice that you included the fact that you kept clear communication all the way through. Great response!

Was this response helpful? or

Anonymous Answer

"I was given a marketing chore past my supervisor since one of the interns was absent for about a calendar week. It was a write up near marketing strategies for a new title for the flavor. Despite working long hours to complete it, I realized that information technology wasn't the quality piece of work I wanted to submit. I was honest with my supervisor about the timeline and told her that I couldn't ship the work on fourth dimension. She was understanding every bit she knew it wasn't my job. She gave me an extra 24-hour interval and sample write-ups to help me. I was embarrassed for not meeting her expectations merely learned to communicate early and ask for help when needed."

Rachelle's Response

The fact that you learned a valuable lesson is the all-time take-away here. Good answer, and well stated.

Was this response helpful? or

Bearding Answer

"I missed a borderline while installing a fence once; due to weather conditions. So my dominate and I stayed late on the days nosotros could work and gave the customer a discount on labor for missing the deadline."

Mary'due south Response

Consider providing more details to elaborate on the State of affairs, Deportment, and Results. Interviewers look to behavioral-based responses to predict how an private will operate in a similar, future circumstance.

"Situation: When I was working at [Employer/Job Championship], I fell behind on a fence installation projection due to inclement weather. Actions: I partnered with my dominate and we both worked extra hours to get the project washed as quickly as possible. We offered a discount to the client on labor charges for going by the deadline. Upshot: The customer was satisfied with the effect, discount, and the installation."

Was this response helpful? or

Anonymous Answer

"I was unable to produce the work before the borderline was when I started working equally a legal administrative banana. I merely finished training within 2 weeks but realized that I was non able to consummate the work in preparing the court files before the deadline. Therefore, I spoke to the attorney and my manager. I best-selling the fact that the work was unable to be fulfilled. I apologized for the inconvenience, and I amended the action the best of my power by offering to stay overtime to terminate the piece of work and to ask for an extension."

Rachelle's Response

It'southward good that you recognized the situation ahead of fourth dimension, and and then approached your manager and the attorney with solutions. Nice reply!

Was this response helpful? or

Anonymous Respond

"It was about the AM/FM radio project. I soldered all the AM section of radio and checked everything, 5 AM station I can tune on the AM part. I have started Soldering FM department of the radio post-obit all instructions. FM part is soldered and set. I melody and plow the knob of the radio; no station is there, just a noise. My borderline is next week. I check every test point; reading was okay. I show information technology to my friend, whose radio works well, to find something if he can, didn't work out. I desolder another one-half part of the excursion and solder it back, zip worked. The deadline came and I show it to the professor and explain; only AM department is working which is not the passing marks. I asked for an actress calendar week extension, he gave information technology to me. I finally found out information technology was the wrong valued resistors I have soldered, which is affecting the FM section of the radio. I replaced information technology with the right value resistor and it worked."

Rachelle'due south Response

Effort shortening upwardly your story a bit, as it will be challenging for the interviewer to follow. Besides, the most important part, which is how y'all reacted to the perceived failure, does not stand out. I accept provided an example, below.

"I was tardily on ane of my projects in school, which was an AM/FM radio project. No matter what I tried, I could not go the FM component of the radio to piece of work properly. I explained the situation to my professor, and he helped me to troubleshoot. I asked for a week extension. During that time, I discovered my error and made the radio work. It was important to me that I not surrender, but proceed going and solve the issue."

Was this response helpful? or

Anonymous Answer

"TMO scripting, unable to meet beginning two deadlines on taking over, but had progressed to evidence thus far and indicated trajectory towards completion and was honest about challenges with the customer."

Cindy's Response

Ok, then information technology sounds like communication was key. Fix your answer in the STAR format (state of affairs, task, activeness, and consequence) to build a robust reply that shows your skills in action.

Was this response helpful? or

Anonymous Answer

"I once turned effectually a project 1 week before the deadline after realizing I was going in the wrong direction. To make up for a lost fourth dimension, I stayed well-nigh evenings and remained focused. I turned the project in on time, with neat feedback on my performance. What I learned from this situation is the importance of asking a supervisor and coworker communication earlier on, to prevent last-infinitesimal changes. The more advice I had asked my coworkers, the better and quicker the project would have been completed."

Rachelle'south Response

Asking for advice or feedback early on on in a project is a neat lesson to learn. I like that you added in a bit about the lesson to learned through the process. Good work!

"I in one case turned around a project ane calendar week before the deadline afterward realizing I was going in the wrong direction. To make upwardly for lost fourth dimension, I stayed most evenings and remained focused. I turned the project in on time, with neat feedback on my operation. What I learned from this situation is the importance of asking a supervisor or coworker for advice earlier on, to forbid last infinitesimal changes."

Was this response helpful? or

Anonymous Answer

"When I started with my current job, I was assigned to run a calendar month-end written report that is fourth dimension-sensitive. The report and data reconciliation is unremarkably done afterwards concern hours to close the system for users and have it ready for them the following mean solar day. In the second month that I was running the report, our system ambassador had run into some problems that delayed the reconciliation. My procedure starts later on the reconciliation. I know from the previous month's experience that we will not exist able to terminate the study in time and have the organization open for the users. Equally soon as I realize the problem, I sent out an e-mail to all the organisation users and explicate the consequence. I also request assist from my coworker to split up the number of reports to be run. We were able to terminate the report 2 hours backside schedule with minimal filibuster on the users to do the daily processes in the system. I also piece of work with the IT administrators to create a contingency plan for the different scenarios that tin can cause whatsoever delay. Nosotros never experienced a delay after that. To engagement, we have automated that reporting with a minimal hands-on approach on my side."

Chad's Response

Groovy! Your case shows a proactive arroyo to the result and an ability to problem solve! The interviewer will undoubtedly be impressed that you remained calm, communicated finer, and acted quickly to complete the reports while minimizing the delay to arrangement users. It sounds like you also already take a plan in place if this state of affairs ever occurs once again, which is a nice addition!

Was this response helpful? or

Bearding Answer

"When unable to see a monthly deadline, I provided what information I had with the expected timeline for the completed project presentation. At one time, I asked for help from a colleague when they could help. The deadline was not met, but it was but a day late with their help."

Rachelle's Response

Adept answer. Information technology's bang-up that yous asked for help!

"When unable to meet a monthly deadline, I provided what information I had with the expected timeline for the completed projection presentation. I asked for help from a colleague also. The deadline was not met, but it was simply one mean solar day late because of my colleague's assist."

Was this response helpful? or

Bearding Answer

"At the beginning of each calendar month, we have a listing of new members to telephone call and do the HRA before the borderline. I received my listing on the end of that week, which ways that I have to make a lot of calls on one day. I stay after hour calling my fellow member, and I was able to turn my list on time before the deadline."

Alexandra's Response

This is a peachy example of a fourth dimension when you went higher up and beyond to meet a deadline. However, if you have an instance of a fourth dimension when you were unable to see the deadline, I would encourage you to apply that example. That will give the interviewer the insight they're looking for. If you lot truly don't have an instance that fits the interviewer's question, then this reply is a good alternative with a few edits I've outlined below.

"I don't accept an case of a fourth dimension I was unable to encounter a projection deadline. However, there was a time when I got really close to non making the deadline. At the beginning of each month, we have a list of new members to phone call and do the HRA before the end of week deadline. I received my list at the end of that calendar week, which meant that I had to make a lot of calls in one mean solar day. I stayed afterwards hours calling my members, and I was able to complete the job on fourth dimension."

Was this response helpful? or

Anonymous Reply

"I was given a project at work once to fix up a DIY section for a particular product in forepart of the pigment desk and have a demo on by 12. I got completely sidetracked with other work and missed the fact that information technology was afterwards 12 and I hadn't fifty-fifty set anything up. I called my boss and told him that I was sad and that I had been actually decorated and that if someone tin come down and cover that paint desk, I will prepare up a DIY demo straight away."

Rachelle's Response

The interviewer volition be happy to hear that yous took accountability for non getting it done. If yous were decorated helping customers, and the time ran abroad from you, I would avoid using the term 'sidetracked' as that could sound equally though y'all were just chilling out with coworkers. :)

Was this response helpful? or

Anonymous Answer

"In the internship of this summer, I was required to help explore the VSLAM application in AGV, but I was unfamiliar with this engineering science, and then it took me much longer than my boss expected. I realized that my step was non what he was expecting, and then I communicated with my boss almost my situation and requested a new deadline. At the same time, I offered to take some books and work dwelling to catch upwards. My boss was happy with my willingness to become over and above to meet his requirements and extended the deadline."

Rachelle's Response

Yous provided an splendid solution, and your willingness to come across your boss' needs by taking your work home shows a cracking deal of dedication.

Was this response helpful? or

Anonymous Answer

"In my current role, I was asked to practise the monthly overtime-report. Because I didn't have training on how to do it, I had to figure out how to practice it first, and the job took me much longer than my boss expected. I was proud that I figured out how to do it on my own, and even though information technology took me longer than expected the starting time time I've done it timely ever since."

Rachelle'southward Response

Information technology'due south wonderful that you taught yourself an important new skill. This is a neat way reply this question since the story has a positive ending for all :)

Was this response helpful? or

Bearding Answer

"In my most current part at that place had been a lot of staff turnover. I was tasked with trying to organize the iii people that previously worked there files. I gave myself 1 calendar week to consummate the task but, as I started diving into information technology I realized each person had their own system and kept different notes etc... when I realized it was a much bigger project than I initially thought I went to the possessor and explained the complication's of the situation. Since the signal was to be able to follow up with these people I suggested I could complete one at a time starting with the kickoff one who left. That worked well and the task did get completed and the customers were not impacted."

Alexandra'south Response

Practiced answer. See below for an example to reword for clarity and specify when you were able to consummate the task. Overall, I like that you address the situation, the task at hand, the actions y'all took, and the results.

"In my almost recent role, at that place had been a lot of staff turnover. I was tasked with trying to organize the files of three people who had left. I gave myself i week to consummate the task. However, as I dove in, I realized each person had their own arrangement of taking notes and keeping track of things. I realized it was a much bigger project than I initially thought and that I wouldn't be able to complete it all in a week. I went to the owner and explained the complication of the state of affairs. I suggested a solution for completing one at a time, prioritizing the files of the first one who left. I was able to complete that one within my initial timeline, and then I moved on to complete the adjacent two in the following week. The process worked well, I completed organizing all three sets of files, and customers were not impacted."

Was this response helpful? or

Anonymous Answer

"Although the project did non meet its deadline date and time, my team stayed consistent with its productivity, and we eventually finished the job with not too much of a backlog."

Kristine's Response

Fashion to maintain a positive attitude and recognize that working slowly is not your norm! Try to think of a specific example where y'all did not see a projection deadline and tell that story using the STAR method: Southward = State of affairs, T = Task, A = Activeness, and R = Outcome. Some people may not meet a deadline when they underestimate the fourth dimension a project will take, when i of their team members doesn't deliver their part on fourth dimension, or when they confront unexpected new urgent tasks that compete for their attention. Regardless of the example you share, be sure to show the event and what you learned.

Was this response helpful? or

Anonymous Answer

"I one time was close to a projection deadline due to under staff required to consummate the piece of work. When in stressful situations, I spring into action and get proactive versus reactive. I reached out to my managing director to asking more hours to complete the project which was granted. My team and I were able to consummate the project two days past due versus an entire calendar week. Overall, everyone was pleased with the consequence, including myself."

Stephanie's Response

Great specific example!

Was this response helpful? or

Bearding Answer

"I had a projection that took a lot longer than we expected it would take. It was a team project on a project, and the squad that I was working with was all extremely decorated, and then we had a very hard time scheduling time to meet. I ended upward deciding to do lunchtime meetings then that nosotros could take advantage of that time and finish the project. It was behind schedule, simply nosotros still completed the projection."

Kristine's Response

Overnice response! The interviewer will exist impressed by your determination to move a project forward despite busy schedules. Yous tin can enhance your answer by mentioning if y'all communicated with anyone such every bit a supervisor or client in accelerate to notify them you would miss the deadline. You lot could also discuss what you learned from the situation and what you lot would do differently in the future. I revised your response a bit for clarity.

"I had a project that took a lot longer than we expected. It was a team project, and my team members were all extremely busy, so we had a very hard fourth dimension scheduling time to come across. I concluded upwardly deciding to do lunchtime meetings so that nosotros could have advantage of that time and finish the projection. Information technology was behind schedule, but nosotros nonetheless completed the project."

Was this response helpful? or

Bearding Respond

"I tin can call back a fourth dimension that I demand to publish the approved results by the borderline equally per the bookish statute. I started the process, as usual, notwithstanding, I was not aware that one senior lecturer was sick and admitted to the hospital and he was not able to check my letters. I approached my supervisor who delegated another academic staff to work on finalizing the class results for me. When I realized that I was unable to meet the borderline for releasing the results, I sent a letter to all students involved and explained the state of affairs and the actions nosotros were taking. I eventually worked through the procedure with the delegated academic colleague and published the results with minimum actress time required."

Rachelle'south Response

Smashing response, detailing the steps that you lot took. The interviewer will exist happy to hear that you were so proactive!

Was this response helpful? or

Bearding Reply

"My district manager had asked me to complete MTMs for all the stores inside the week which I said I would be able to complete withal, I underestimated the amount of time some of the claims were taking because I had to look for doctors or patients to get back to me. I notified my manager the reason for the delay and gave him a more realistic timeline of when the chore would be completed. I continued to follow upwardly and stay a few hours more and scheduled appointments for patients to come in to help run into this deadline."

Rachelle's Response

Corking answer and great job bringing it all together. I would suggest typing out what MTM means, and putting the acronym right afterward that. This shows that you thought about what you could have done better here, and what you did to fix the problem.

"My Commune Manager asked me to complete Medication Therapy Management for all our stores, inside the calendar week. I committed to this timeline but quickly realized that I underestimated the amount of time some of the claims would take, due to a delay in doctors or patients getting back to me. I did communicate this to my manager and let him know the reason for my delay and gave him a more realistic timeline of when the task would be completed. I connected to follow up with patients and worked extra hours to come across the deadline."

Was this response helpful? or

Anonymous Answer

"There was a fourth dimension when I could not produce the financial statement on time due to a system malfunction. I worked with the IT team to accost the event and stayed late to resolve the problem."

Rachelle's Response

Try offering up a fuller response while following the STAR framework (State of affairs, Job, Action, Upshot). The goal with this question should be to bring the story to life, highlighting the specific advice skills and piece of work ethic yous deployed during this situation.

Was this response helpful? or

zamudiogodid1955.blogspot.com

Source: https://www.mockquestions.com/interview/Behavioral/Tell+me+about+a+time+when+you+were+unable+to+meet+a+project+deadline.+How+did+you+react%3F.html